1. POWER GENERATION , DISTRIBUTION & UTILIZATION
a- Survey of Egyptian Energy Sources, 1979
Oil , Gas, Coal , and Sources of Renewable
Energy
b- Study of Power requirement , and Design
of Electrical Network for :
Egyptian Industrial and Financial Company,
“ Fertilizer Plant in Kafr
El-Zayyat”
c- Study of
Thermal Heat requirement, and Design of Steam Generation Plant for
:
Egyptian Industrial and Financial Company,
“ Fertilizer Plant in Kafr
El-Zayyat”
d-Survey and Study of Gas Generation and Power Production for :
Egyptian Industrial and Financial Company,
“ Fertilizer Plant in Assuit
e- Study the Power requirement and Design
of Power Station and Distribution Network for :
Heliopolis Society Village , North
Coast , Egypt
f- Study and Analysis of Rehabilitation
of Oil Extraction Plant for :
The Egyptian Salt & Soda Company
, Egypt
Capacity 600 Tons Cotton Seeds /day
g- Study and Analysis of Menia Cement Plant,
Menia Province, Egypt
h- Study on the Rational Utilization of
Cotton Stalks as Fuel for Domestic Use.
FRCU Project.
k- Design of Steam Generation Plant
using Rice Hulls ,
Beheira Rice Mills Company, Egypt
l-
Design of Domestic Agricultural Residues Burning Stove.
m- Design of Garbage Incinerators.
n- Design and construction of Industrial Residues Burning Incinerator.
2.
GRAIN :
Rice:
Rice Milling Companies:
a-East of Alexandria & Rasheed
Rice Mill Company
Contract : 1968
Milling factories at:
Edco : One Mill, capacity 130 t/day
Rasheed : 5 Mills, capacities
ranging
from 50 to 100 t/day
b-El-Beheira Rice Mill Company
Contract : 1969
Milling factories at:
Damanhour
Kafr Al-Dawar
Abu Hommos
c-El-Gharbia Rice Mill Company
Contract : 1970
Milling factories at :
El-Mahala El-Kobra
Qutoor
d-Rice Marketing Company
Packaging and Distribution of
Rice
Wheat :
a-North Cairo Flour Mill Company
Consultation work on:
Date : 1972
Purchase of new flour mills
& renewal of existing mills.
Bakeries :
Study and choice of Automatic
bakery equipment, and supervision of
erection and start-up of:
-El-Salam Bakery , capacity :
6000 loaves/hr
Location: El-Sharabia ,Cairo
Date : 1978
-Kashkoosh Bakery, capacity :
6000 loaves/hr
Location: Rod El-Farag, Cairo
Date : 1978
-Egyptian Armed Forces,
2-Automatic bakery lines,
capacity: 6000 loaves/hr, each.
Date : 1979.
2- Mobile bakery lines,
capacity: 2000 loaves/hr, each
Date : 1979
2- Mobile bakery lines,
capacity: 2000 loaves/hr, each
Date : 1982
-El-Menia Food Security Company
Date : 1981.
a- One bakery line at Menia
city,
capacity : 8000 loaves/hr
Arabic bread
1500 pcs/hr,
European bread
b- One bakery line at Mallawy
city
capacity : 8000 loaves/hr,
Arabic bread.
-Heliopolis Bakery,
Date : 1982
Feasibility study for Bakery
Project at Badrasheen,
Governorate of Geiza-Egypt.
capacity : 2000 loaves/hr
for a loan from:
The Industrial Development
Bank
Cairo - Egypt
Grain Handling :
a- Technical analysis and study report
on the offers submitted to
“The General Authority for Supply Commodity
Purchase Committee for Investment
Equipment and Commodities.”
To procure : Grain
VAC-U-VATORS
Under A.I.D Program
I.F.B.3/76
Date 1977
b- Technical report on Grain
VAC-U-VATORS
Submitted to :
“ General Company for Silos”
10 Sayed Darwish street,
Cairo
Date, Nov.5,1977
c- Participation in the technical
Committee for the purchase of 30,000 Ton
Silos at Safaga
for : General Company for
Silos.
d- Study of small scale silos
Submitted to :
Development and Agricultural
Credit Bank of Qualyubia.
3. Vegetables:
Dehydration :
-
Feasibility study for the
production of Dehydrated, Onions, Garlic, Pepper,
Cabbage, and Carrots.
Capacity : 3 Tons/day
For Tambo Vegetable
Dehydration Company
Tambo, Menia Governorate
Financed by Misr Bank.
Date : 1978
-
Choice of Equipment, Supervision
of Erection, and Start-up of one
Vegetable Dehydration Line,
For Tambo Vegetable
Dehydration Company
Tambo, Menia Governorate,
Date : 1979
-Feasibility study for :
Vegetable preparation,
freezing ,and storing plant .
For : Egyptian Farmers
Company, Cairo
Date : 1984
- Study, and engineering
preparation for:
One Vegetable Preparation Line
and Freezing
Tunnel of Capacity 3
Tons/day
For Montana Company , Benha,
Qualyubia
1981.
- Feasibility Study for:
“ Vegetable Preparation Plant
“
For: Cairo Ice and
Refrigeration Company
1986
4-
Oil Crops:
Consultancy work for :
- Salt and Soda Company,
Alexandria,
Main Production:
Vegetable Oil
Animal Feed
Soap
- Cairo Oil and Soap Company,
Cairo
Main production:
Vegetable Oil
Animal Feed
Soap
- El-Nile Oil and Soap Company,
Cairo
Main Production
Vegetable Oil
Animal Feed
Soap
Detergent.
Participation in the Feasibility
studies of :
- Joint-Venture Project for:
Oil Extraction and Animal Feed Production
Plant, from Soya Beans and/or
Sunflower Seeds
For: Egyptian Salt and Soda
Company.
Financed by KFW , Germany
1980
- Renewal of the Existing
Facilities for Oil-
Extraction from Cotton Seeds,
Capacity 800t/day
For: Egyptian Salt and Soda
Company
1984.
5.
Meat
a- Feasibility study for Poultry Slaughter-house
Submitted to :
Marinjac Company,
Heliopolis ,Cairo,
1978
b- Study of Offers, and Choice
of Equipment for:
“ Bassateen Modern Abattoir”
Capacity : 400 Cattle/day
For : General Engineering and
Refrigeration
Company, Egypt .
1981.
c- Feasibility study of :
“ Meat processing plant”
For : Cairo Ice and
Refrigeration Company
Cairo , Egypt
1986.
6.
Animal Feed Production:
Inspection of delivered
Equipment for:
a- National Feed Company, Tanta,
Egypt
Capacity 120 tons/hr.
1985.
b- Rashid Rice-Mill Company,
Alexandria, Egypt
Capacity : 20 tons/hr
1987.
c- Dammietta and Belkas
Rice-Mill Company,
Belkas , Egypt.
Capacity : 20 tons/hr.
1987.
Technical studies:
- Raising the capacity of
Animal Feed Production
Plant, from 10 to 20 tons/hr,
For : Sharkia Rice-Mill Company
1985.
7- Seed Preparation, Cleaning and Treatment.
Contract study and Survey of Delivered
Equipment
- Egyptian Agricultural
Organization
a- Bahteem Plant,
Capacity : 1.0 t/hr
b- Tanta Plant,
Capacity : 5.0 t/hr
- National Seed Company
a- Capacity : 5.0 t/hr
Date: 1990
8- Pasta and Artificial Rice Production Plant
a- Sharkia Rice Mill Company
Capacity : 1500 kg/hr pasta
goods
or,1500 kg/hr
artificial rice
and, 500 kg/hr
long goods
Date : 1989
b- Dakahlia Rice Mill Company
Capacity : 1500 kg/h pasta
goods,or
1500 kg/h
artificial rice
and, 750 kg/hr,
long goods.
Date : 1991
c- Rice Marketing Company
Capacity :1000 kg/hr Short
goods, or
1000 kg/hr
Shaareya
and, 500 kg/hr,
Long goods
Date : 1991
9- Cold Storage and Ice Making Plants:
Technical consultation for :
General Engineering and
Refrigeration Company,
GERCO
14, Emad El-Din Street ,
Cairo
Projects :
a- Feasibility study for the proposed
Cold Storage Facilities and Bead Board Insulation Material
Manufacturing Plant.
Cairo, Egypt,
1975,
This report incorporates the assembly
of data to establish a 10,000 ton Cold
Storage, and a Bead-Board production Plant, supplied by Carland Marine and Construction Company, Inc.
in a format compatible with that required by Overseas Private Investment
Corporation,OPIC, for financing applications.
The report is jointly
prepared with Tillyard International Inc.
b- Feasibility study for a 1000 ton,
Cold Storage and Supervision of Supply and Erection.
For : Tambo Vegetable
Dehydration and Food
Storage Company
Date : 1979
c- Design and supervision of
erection of a 15-ton Ice-Plant,
For: Mr. Mohamed Nafei,
Motobus - Egypt
Date : 1978
d- Technical study and
analysis report on offers
submitted to :
Cairo Ice and Refrigeration
company, for
One, 150 tons/hr capacity
Ice making plant
Date : 1978
e- Technical specifications
for a 3000 ton
capacity Cold Storage , at Zagazig,
Egypt
For : GERCO, Cairo, Egypt
Date : 1979
10-
Trucking and Transportation equipment
a- Technical analysis and
study report on the offers submitted to : The General Authority for Supply
Commodities Purchase Committee for Investment Equipment and Commodities
To procure :
Truck tractors, and
Refrigerated Trailers and Trucks.
Under A.I.D. Program I.F.B.
2/76/A
Date 1976
b- Technical Analysis and
study report on the offers submitted to :
The General Authority for Supply
Commodities Purchase Committee for
Investment Equipment and
Commodities.
To procure :
Truck Tractors, and
Refrigerated Trailers and Trucks.
Under A.I.D. Program I.F.B. 2/76/B
Date : 1976
Feasibility
studies for projects, for The World Bank financing
-Expansion
and Diversification of Weaving Operations at
Fobane Weavers.
Maseru, Lesotho
1988
-Seed
and Animal Feed, Processing and Packaging Plant
Investor:
Len Makhwani
Maseru, ,Lesotho
1988
-Meat
Processing, Storing,and Sales
Investor:
Tefo Herbert Buti,
Maseru, Lesotho
1988
-Broiler
Hatchery
Investor,
Daniel Sekeleoane
Maseru, Lesotho
1989
-Vegetable
Green-House
Investor,
Dr.L.Khomari
Mohales Hook, Lesotho
1989
-Dairy
Farm
Investor,
Daniel Sekeleoane,
Maseru, Lesotho
-Rehabilitation
of the National Pig Herd
Investor,
Government of Lesotho
1990
-Grain
Storage,
Investor,
Government of Lesotho
1990
-
Mutton Production and Fodder Production
Investor,
Dr.
F. Abd El-Messeih
Dr.
L. Khomari
Maseru,
Lesotho